Facilities Planning
Complete Standards Manual 2010
Table of Contents
Click the blue text to view/print each document.
COVER PAGE
REVISION DATES
INTRODUCTION
TABLE OF CONTENTS
DIVISION 00: INTRODUCTORY, PROCUREMENT, CONTRACTING INFORMATION
INTRODUCTORY INFORMATION
00 00 00 CODES (New)
00 00 00 CONSTRUCTION CODES
00 01 00 GENERAL INFORMATION
00 01 10 DOCUMENT STANDARDS
00 01 11 PRESENTATION DOCUMENTS
00 01 12 SPECIFICATIONS
00 01 13 DRAWINGS (Revised)
00 01 15 PROJECT REVIEWS
00 01 20 ADHERENCE TO STANDARDS
00 01 30 BUDGET
00 01 40 HAZARDOUS MATERIALS
00 01 50 PHOTOGRAPHIC MATERIALS
00 02 00 SITE PLANNING
00 02 10 GENERAL
00 02 20 SOIL BORINGS
00 02 30 FLOOD CONTROL
00 02 40 UTILITY DESIGN
00 02 41 GENERAL
00 02 50 CAMPUS UTILITY SYSTEMS
00 02 51 GENERAL
00 03 00 ARCHITECTURAL REQUIREMENTS
00 03 10 GENERAL
00 03 11 ORIENTATION
00 03 12 ARCHITECTURAL CHARACTER
00 03 13 SUSTAINABLE DESIGN (Revised)
00 03 13.01 SITES
00 03 13.02 BUILDING ENVELOPE & BUILDING SYSTEMS (Revised)
00 03 13.03 COMMISSIONING
00 03 16 ACCESSIBLE DESIGN
00 03 20 BUILDING ENVELOPE
00 03 21 GENERAL
00 03 22 EXTERIOR WALL CONSTRUCTION
00 03 23 ROOF
00 03 30 ACOUSTICAL CONSIDERATIONS
00 03 40 SPACE ALLOCATIONS
00 03 41 CUSTODIAL & OTHER BUILDING SUPPORT ROOMS
00 03 42 MECHANICAL EQUIPMENT ROOMS (Revised)
00 03 43 TOILET ROOMS
00 03 44 ELECTRICAL EQUIPMENT ROOMS (Revised)
00 03 45 TELECOM EQUIPMENT ROOMS
00 03 46 BUILDING CLUSTER MECHANIC WORK ROOMS (Revised)
00 03 50 ROOM & EQUIPMENT NUMBERING (Revised)
00 03 60 HOUSING CONSIDERATIONS (Revised)
00 03 70 FURNITURE, FIXTURES & FIXED EQUIPMENT (FF&E)
PROCUREMENT PROCEDURES
00 10 00 SOLICITATION
00 11 00 ADVERTISEMENT AND INVITATION
CONTRACTING REQUIREMENTS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
00 73 16 INSURANCE REQUIREMENTS (Revised)
00 73 19 HEALTH & SAFETY REQUIREMENTS (Revised)
00 73 36 EQUAL OPPORTUNITY EMPLOYMENT REQUIREMENTS
00 73 43 WAGE RATE REQUIREMENTS (Revised)
DIVISION 01: GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS (Revised)
01 20 00 PRICE AND PAYMENT PROCEDURES
01 21 00 ALLOWANCES
00 21 13 CASH ALLOWANCES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 26 57 CHANGE ORDER REQUESTS
01 29 76 PROGRESS PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 33 23 SHOP DRAWINGS, PRODUCT DATA, SAMPLES (Revised)
01 40 00 QUALITY REQUIREMENTS
01 41 00 REGULATORY REQUIREMENTS
01 41 19 RULES
01 45 00 QUALITY CONTROL
01 45 23 TESTING & INSPECTION SERVICE
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 41 00 REGULATORY REQUIREMENTS
01 41 19 RULES
01 45 00 QUALITY CONTROL
01 45 23 TESTING & INSPECTION SERVICE
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 41 19 RULES
01 51 00 TEMPORARY UTILITIES
01 51 01 GENERAL
01 51 13 TEMPORARY ELECTRICITY
01 51 23 TEMPORARY HEATING, COOLING AND VENTILATING
01 51 26 TEMPORARY LIGHTING
01 51 33 TEMPORARY COMMUNICATIONS
01 51 36 TEMPORARY WATER
01 52 00 CONSTRUCTION FACILITIES
01 52 19 SANITARY FACILITIES
01 56 00 TEMPORARY BARRIERS AND ENCLOSURES
01 56 36 TEMPORARY SECURITY ENCLOSURES
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 57 00 TEMPORARY CONTROL
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL
01 58 00 PROJECT IDENTIFICATION
01 58 13 TEMPORARY PROJECT SIGNAGE
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 46 EXTRA (ATTIC) STOCK MATERIALS
01 78 46.13 SCHEDULE OF REQUIRED MINIMUM ATTIC
STOCK COMPONENTS (Revised)
DIVISION 02: EXISTING CONDITIONS
02 40 00 DEMOLITION AND STRUCTURE MOVING
02 42 00 REMOVAL AND SALVAGE OF CONSTRUCTION MATERIALS
02 80 00 FACILITY REMEDIATION
02 82 00 ASBESTOS REMEDIATION
02 82 13 ASBESTOS ABATEMENT (Revised)
02 83 00 LEAD REMEDIATION
02 83 13 LEAD HAZARD CONTROL ACTIVITIES
DIVISION 04: MASONRY
04 00 00 MASONRY
04 00 00 MASONRY UNITS
04 01 00 MAINTENANCE OF MASONRY
04 01 20 MAINTENANCE OF UNIT MASONRY
04 01 20.51 UNIT MASONRY MAINTENANCE (Revised)
04 01 20.52 UNIT MASONRY CLEANING (Revised)
04 05 00 COMMON WORK RESULTS FOR MASONRY
04 05 13 MASONRY MORTARING (New)
04 05 19 MASONRY ANCHORING AND REINFORCING
04 05 19 MASONRY ANCHORING AND REINFORCING
04 05 19.13 CONTINUOUS JOINT REINFORCING
04 05 19.16 MASONRY ANCHORS
04 05 23 MASONRY ACCESSORIES
04 05 23.13 MASONRY CONTROL AND EXPANSION JOINTS
04 05 23.16 MASONRY EMBEDDED FLASHINGS
04 05 23.19 MASONRY CAVITY DRAINAGE, WEEPHOLES AND VENTS (Rev'd)
04 05 23.16 MASONRY EMBEDDED FLASHINGS
04 05 23.19 MASONRY CAVITY DRAINAGE, WEEPHOLES AND VENTS (Rev'd)
04 20 00 UNIT MASONRY
04 21 00 CLAY UNIT MASONRY (New)
04 21 13 BRICK MORTARING
04 22 00 CONCRETE UNIT MASONRY (New)
04 21 13 BRICK MORTARING
04 22 00 CONCRETE UNIT MASONRY (New)
04 40 00 STONE ASSEMBLIES (New)
04 43 00 STONE MASONRY (New)
DIVISION 05: METALS
05 50 00 METAL FABRICATIONS
05 59 00 METAL SPECIALTIES
DIVISION 06: WOOD, PLASTICS AND COMPOSITES
06 00 00 WOOD, PLASTIC AND COMPOSITES
06 10 00 ROUGH CARPENTRY (New)
06 11 00 WOOD FRAMING
06 40 00 ARCHITECTURAL WOODWORK
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
06 42 00 WOOD PANELING
06 42 16 WOOD-VENEER PANELING
DIVISION 07: THERMAL AND MOISTURE PROTECTION
07 00 00 THERMAL AND MOISTURE PROTECTION
07 05 00 COMMON WORK RESULTS FOR THERMAL
& MOISTURE PROTECTION (Revised)
07 10 00 DAMPPROOFING AND WATERPROOFING
07 10 00 DAMPPROOFING AND WATERPROOFING
07 13 00 SHEET WATERPROOFING
07 20 00 THERMAL PROTECTION (New)
07 21 00 THERMAL INSULATION
07 21 13 BOARD INSULATION
07 21 26 BLOWN INSULATION
07 30 00 STEEP SLOPE ROOFING (New)
07 30 00 SHINGLES & SHAKES
07 31 13 ASPHAULT SHINGLES
07 40 00 ROOFING AND SIDING PANELS
07 41 00 ROOF PANELS
07 41 13 METAL ROOF PANELS
07 50 00 MEMBRANE ROOFING (New)
07 53 00 ELASTOMERIC MEMBRANE ROOFING
07 53 32 EPDM
07 55 63 VEGETATED ROOFING
DIVISION 08: OPENINGS
08 01 00 OPERATION AND MAINTENANCE OF OPENINGS (Revised)
08 10 00 DOORS AND FRAMES
08 12 00 METAL FRAMES
08 12 13 HOLLOW METAL FRAMES
08 14 00 WOOD DOORS
08 14 16 FLUSH WOOD DOORS
08 14 23 CLAD WOOD DOORS
08 30 00 SPECIALTY DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 31 13 ACCESS DOORS AND FRAMES
08 33 00 COILING DOORS AND GRILLES
08 33 13 SIDE & OVERHEAD COILING DOORS AND GRILLES
08 36 00 PANEL DOORS
08 40 00 ENTRANCES, STOREFRONTS AND CURTAIN WALLS
08 36 00 PANEL DOORS
08 40 00 ENTRANCES, STOREFRONTS AND CURTAIN WALLS
08 41 00 ENTRANCES AND STOREFRONTS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 70 00 HARDWARE
08 71 00 DOOR HARDWARE
08 79 00 HARDWARE ACCESSORIES
08 79 13 KEY STORAGE (KNOX BOX)
08 79 00 HARDWARE ACCESSORIES
08 79 13 KEY STORAGE (KNOX BOX)
08 80 00 GLAZING
08 81 00 GLASS GLAZING
DIVISION 09: FINISHES
09 05 00 COMMON WORK RESULTS FOR FINISHES (New)
09 20 00 PLASTER AND GYPSUM BOARD
09 21 00 PLASTER AND GYPSUM BOARD ASSEMBLIES
09 30 00 TILING
09 30 16 QUARRY TILING
09 50 00 CEILINGS
09 51 00 ACOUSTICAL CEILINGS
09 51 23 ACOUSTICAL CEILING TILE
09 60 00 FLOORING
09 65 00 RESILIENT FLOORING
09 65 19 RESILIENT TILE
09 68 00 CARPETING (Revised)
09 70 00 WALL FINISHES
09 72 00 WALL COVERINGS
09 90 00 PAINTING AND COATING
09 91 00 PAINTING (Revised)
DIVISION 10: SPECIALTIES
10 10 00 INFORMATION SPECIALTIES
10 11 00 VISUAL DISPLAY SURFACES
10 11 16 MARKER BOARDS
10 11 23 TACKBOARDS
10 11 30 PROJECTION SCREENS
10 14 00 SIGNAGE
10 20 00 INTERIOR SPECIALTIES
10 21 00 COMPARTMENTS AND CUBICLES
10 21 13 TOILET COMPARTMENTS
10 21 16 SHOWER AND DRESSING COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES
10 28 13 TOILET ACCESSORIES
10 28 13.13 COMMERCIAL TOILET ACCESSORIES
10 40 00 SAFETY SPECIALTIES
10 44 00 FIRE PROTECTION SPECIALTIES
10 50 00 STORAGE SPECIALTIES
10 55 00 POSTAL SPECIALTIES
10 55 13 CENTRAL MAIL DELIVERY BOXES
10 56 00 STORAGE SPECIALTIES
10 56 16 FABRICATED WOOD STORAGE SHELVING
DIVISION 11: EQUIPMENT
11 10 00 VEHICLE AND PEDESTRIAN EQUIPMENT
11 12 00 PARKING CONTROL EQUIPMENT
11 12 23 PARKING METERS
11 31 00 RESIDENTIAL APPLIANCES
11 31 01 RESIDENTIAL KITCHEN AND LAUNDRY APPLIANCES
DIVISION 12: FURNISHINGS
12 10 00 ART
12 20 00 WINDOW TREATMENTS
12 21 00 WINDOW BLINDS
12 21 13 HORIZONTAL LOUVER BLINDS (Revised)
12 30 00 CASEWORK
12 36 00 COUNTERTOPS
12 36 61 SIMULATED STONE COUNTERTOPS
12 36 61.16 SOLID SURFACE COUNTERTOPS (Revised)
12 40 00 FURNISHINGS AND ACCESSORIES
12 48 00 RUGS AND MATS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 90 00 OTHER FURNISHINGS
12 93 00 SITE FURNISHINGS
12 93 13 BICYCLE RACKS
12 93 23 TRASH AND LITTER RECEPTACLES (Revised)
12 93 43 SITE SEATING AND TABLES
DIVISION 14: CONVEYING EQUIPMENT
14 20 00 ELEVATORS
14 24 00 HYDRAULIC ELEVATORS (Revised)
DIVISION 21: FIRE SUPPRESSION
21 00 00 FIRE SUPPRESSION
21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION (Revised)
DIVISION 22: PLUMBING
22 00 00 PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 01 GENERAL REQUIREMENTS
22 05 19 METERS AND GAUGES FOR PLUMBING PIPING
22 05 23 GENERAL DUTY VALVES FOR PLUMBING PIPING
22 06 00 SCHEDULES FOR PLUMBING
22 06 10 SCHEDULES FOR PLUMBING PIPING AND PUMPS
22 07 00 PIPING INSULATION
22 07 19 PLUMBING PIPING INSULATION
22 08 00 COMMISSIONING OF PLUMBING
22 10 00 PLUMBING PIPING AND PUMPS
22 11 00 FACILITY WATER DISTRIBUTION
22 14 00 FACILITY STORM DRAINAGE
22 40 00 PLUMBING FIXTURES
22 42 00 COMMERCIAL PLUMBING FIXTURES
DIVISION 23: HEATING, VENTILATING & AIR CONDITIONING (HVAC)
23 00 00 HEATING, VENTILATING AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 01 GENERAL REQUIREMENTS (Revised)
23 05 02 MECHANICAL DRAWINGS (Revised)
23 05 19 METERS AND GAUGES FOR HVAC PIPING (Revised)
23 05 23 GENERAL DUTY VALVES FOR HVAC PIPING
23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC
23 06 00 SCHEDULES FOR HVAC
23 06 20 SCHEDULES FOR HVAC PIPING AND PUMPS
23 07 00 HVAC INSULATION
23 07 19 HVAC PIPING INSULATION
23 08 00 COMMISSIONING OF HVAC
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 20 00 HVAC PIPING AND PUMPS
23 21 00 HYDRONIC PIPING AND PUMPS (Revised)
23 22 00 STEAM AND CONDENSATE PIPING AND PUMPS
23 30 00 HVAC AIR DISTRIBUTION
23 31 00 HVAC DUCTS AND CASINGS (Revised)
23 36 00 AIR TERMINAL UNITS
23 36 16 VARIABLE-AIR-VOLUME UNITS
23 40 00 HVAC AIR CLEANING DEVICES
23 41 00 PARTICULATE AIR FILTRATION
23 83 00 RADIANT HEATING UNITS
23 83 16 RADIANT HEATING- HYDRONIC PIPING (SNOW MELT)
DIVISION 26: ELECTRICAL
26 00 00 ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 01 GENERAL REQUIREMENTS
26 05 01.01 ALL UNIVERSITY BUILDINGS
26 05 01.05 UNIVERSITY STUDENT HOUSING
26 05 01.09 INSPECTIONS, ADJUSTMENTS, BALANCING
26 05 01.13 RECORD DRAWINGS,GUARANTEES,WARANTEES &
BONDS
26 05 01.17 ITEMS DESIGNERS ARE TO AVOID
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS &
CABLES (Revised)
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 10 00 MEDIUM-VOLTAGE ELECTRICAL DISTRIBUTION
26 12 00 MEDIUM VOLTAGE TRANSFORMERS
26 13 00 MEDIUM VOLTAGE SWITCHGEAR
26 13 13 MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR
26 20 00 LOW-VOLTAGE ELECTRICAL TRANSMISSION
26 22 00 LOW-VOLTAGE TRANSFORMERS
26 22 13 LOW VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 00 SWITCHBOARDS AND PANELBOARDS
26 24 16 PANELBOARDS
26 24 19 MOTOR CONTROL CENTERS
26 27 00 LOW-VOLTAGE DISTRIBUTION EQUIPMENT
26 27 13 ELECTRICAL METERING
26 27 26 WIRING DEVICES
26 28 00 LOW-VOLTAGE CIRCUIT PROTECTIVE DEVICES
26 28 11 DISCONNECTS
26 28 13 FUSES
26 29 00 LOW-VOLTAGE CONTROLLERS
26 30 00 FACILITY ELECTRICAL POWER GENERATING AND STORING
EQUIPMENT
26 36 00 TRANSFER SWITCHES
26 33 00 BATTERY EQUIPMENT (New)
26 33 53 STATIC UNINTERRUPTABLE POWER SUPPLY
26 50 00 LIGHTING
26 51 00 INTERIOR LIGHTING
26 51 11 GENERAL
26 51 13 INTERIOR LIGHTING FIXTURES, LAMPS, AND BALLASTS
26 56 00 EXTERIOR LIGHTING
DIVISION 27: COMMUNICATIONS
27 00 00 COMMUNICATIONS
27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS
27 05 01 GENERAL REQUIREMENTS (Revised)
27 53 00 DISTRIBUTED SYSTEMS
27 53 13 CLOCK SYSTEMS
DIVISION 28: ELECTRONIC SAFETY AND SECURITY
28 10 00 ELECTRONIC ACCESS CONTROL AND INTRUSION DETECTION
28 13 00 ACCESS CONTROL
28 13 19 ACCESS CONTROLS SYSTEMS INFRASTRUCTURE (Revised)
28 30 00 ELECTRONIC DETECTION AND ALARM
28 31 00 FIRE DETECTION AND ALARM (Revised)
DIVISION 31: EARTHWORK
31 10 00 SITE CLEARING
31 11 00 CLEARING AND GRUBBING
31 14 00 EARTH STRIPPING AND STOCK PILING
31 14 13 SOIL STRIPPING AND STOCKPILING
DIVISION 32: EXTERIOR IMPROVEMENTS
32 05 00 COMMON WORK RESULTS FOR EXTERIOR IMPROVEMENTS
32 10 00 BASES, BALLASTS AND PAVING
32 11 00 BASE COURSES
32 11 13 SUBGRADE MODIFICATIONS
32 11 16 SUBBASE COURSES
32 11 23 AGGREGATE BASE COURSES
32 12 00 FLEXIBLE PAVING
32 12 01 QUALITY CONTROL AND ASSURANCE
32 12 01.13 QUALITY CONTROL (CONTRACTOR)
32 12 01.16 QUALITY ASSURANCE (ENGINEER)
32 12 01.23 VERIFICATION OF QUALITY CONTROL TESTS
32 12 16 ASPHALT PAVING
32 12 16.13 PLANT MIX ASPHALT PAVING
32 12 36 SEAL COATS
32 12 43 POROUS FLEXIBLE PAVING
32 13 00 RIGID PAVING
32 13 10 CONTINUOUS REINFORCED CEMENT CONCRETE
PAVEMENT
32 14 00 UNIT PAVING
32 14 13 PRECAST CONCRETE UNIT PAVING
32 14 16 BRICK UNIT PAVING
32 16 00 CURBS AND GUTTERS
32 16 13 CONCRETE CURBS AND GUTTERS
32 17 00 PAVING SPECIALTIES
32 17 23 PAVEMENT MARKINGS
32 30 00 SITE IMPROVEMENTS
32 35 00 SCREENING DEVICES
32 35 10 EARTH BERMS
32 35 13 SCREENS
32 80 00 IRRIGATION
32 84 00 PLANTING IRRIGATION
32 84 23 UNDERGROUND SPRINKLING (Revised)
32 90 00 PLANTING
32 91 00 PLANTING PREPARATION
32 91 13 SOIL PREPARATION (Revised)
32 92 00 TURF AND GRASSES
32 92 19 SEEDING (Revised)
32 92 23 SODDING
32 93 00 PLANTS
32 93 33 SHRUBS
32 93 43 TREES
32 94 00 PLANTING ACCESSORIES
32 94 43 TREE GRATES
32 96 00 TRANSPLANTING
32 96 43 TREE TRANSPLANTING
DIVISION 33: UTILITIES
33 00 00 UTILITIES
33 10 00 WATER UTILITIES
33 50 00 FUEL DISTRIBUTION UTILITIES (New)
33 51 00 NATURAL GAS DISTRIBUTION
APPENDICES
GVSU L.E.E.D. Guidelines, L.E.E.D.-NC v 2.2.
Based on the Application Guide for Multiple Buildings and On-Campus Building Projects (AGMBC)
APPENDIX B
Standard Hardware Schedule (Revised)
Illustrations:
Standard Details
Division 00
00.001 Truck & Fire Equipment Minimum Turning Radii
Division 05
05.001 Typical Guard Post (Revised)
Division 06
06.001 Lounge Kitchen Counter Detail
Division 08
08.001 BEST Cylinder Set Screw & Disk
Division 10
10.01 NOT USED
10.02 Kimberly-Clark hand towel dispenser (Allendale Campus Public restrooms)
10.03 SCA 56T1 toilet tissue dispenser (Allendale Campus Public restrooms)
10.04 GP en Motion hand towel dispenser (Pew Campus Public restrooms)
10.05 Royce Rolls toilet tissue dispenser (Pew Campus Public restrooms)
10.06 Bobrick utility shelf w/ mop/broom holders & rag hooks (All Campuses)
Division 11
11.01 Typical Parking Meter Installation Details
Division 12
12.001 Buttler Ash Receptacle (Forms & Surfaces)
12.002 Plexus Litter (Landscape Forms)
12.003 Plexus bench seating (Landscape Forms)
12.004 Plexus Carousel table w/standard seating (Landscape Forms)
12.005 Plexus Carousel table w/ADA standard seating (Landscape Forms)
12.006 Plexus Equinox umbrella (Landscape Forms)
Division 22
22.001 Water Shut-off Valve Maintenance Pad
22.002a-d Janitor Closet Piping Detail
Division 23
23.001 Standard Air Handling Unit Condensate Drain
23.002 Steam Trap Piping Schematic
Division 27
27.001 Typical Classroom telecom layout (Revised)
27.002 Typical Classroom in-wall telecom conduit/box detail (Revised)
27.003 Typical Classroom Lighting/Switching Layout
27.004 Typical CASEROOM in-floor telecom conduit/box detail (Revised) 27.005 Standard Extron Box Detail
27.006 Standard LCD Wall Mounting Preparation Detail (Revised)
27.006 Standard LCD Wall Mounting Preparation Detail (Revised)
Division 32
32.001a Concrete Paving Detail- Pedestrian/Medium Wt Vehicles (Revised)
32.001b Concrete Paving Detail- Heavy Weight Vehicles (Revised)
32.001b Concrete Paving Detail- Heavy Weight Vehicles (Revised)
32.002 Concrete Joint Detail
32.002a Unit Pavers on Concrete Base w/ Snow Melt
32.003 Typical Concrete Paving Plan
32.004 Typical Tree Installation Detail (Revised)
32.005 Typical Shrub Installation Detail
32.006 Tree Grate Planting Detail (For use on City of GR Property)
32.007 Tree Grate Section
32.008 Standard Curb & Gutter
32.009 Flush Curb & Gutter
32.010 Rolled Curb & Gutter
32.011 Sidewalk Ramp Detail
32.012 Maintenance Strip Detail
32.013 Bituminous Paving Section
32.014 Typical 8 c.y. Dumpster Enclosure
Bulletin 285: Construction around trees on campus
GVSU Standards/Guidelines Deviation Form
APPENDIX F - (Removed May 2010)
List of Supplementary Mechanical Information
APPENDIX H
pg 2 Net Assignable Area
pg 3 Circulation Area
pg 4 Custodial Area
pg 5 Mechanical Area
pg 6 Construction Area
pg 7 Annual Operating Budget
pg 8 Net to Gross Ratios - Guidelines: Various Bldg Types
pg 3 Circulation Area
pg 4 Custodial Area
pg 5 Mechanical Area
pg 6 Construction Area
pg 7 Annual Operating Budget
pg 8 Net to Gross Ratios - Guidelines: Various Bldg Types
APPENDIX I
ADA Illustrations
4.2 Space Allowances and Reach Ranges
4.3 Accessible Routes
4.4 Protruding Objects
4.5 Grounds and Floor Surfaces
4.5 Parking and Passenger Loading Zones
4.8 Ramps
4.10 Elevator
4.13 Doors
4.15 Drinking Fountains and Water Coolers
4.16 - 4.26 Bathrooms, Bathing Facilities, Shower
Rooms, Closets Grab Bars and Handrails
4.31 Telephones
4.33 Assembly Areas
5.0 Restaurants and Cafeterias
8.0 Libraries
A4.27 Controls and Operating Mechanisms
4.2 Space Allowances and Reach Ranges
4.3 Accessible Routes
4.4 Protruding Objects
4.5 Grounds and Floor Surfaces
4.5 Parking and Passenger Loading Zones
4.8 Ramps
4.10 Elevator
4.13 Doors
4.15 Drinking Fountains and Water Coolers
4.16 - 4.26 Bathrooms, Bathing Facilities, Shower
Rooms, Closets Grab Bars and Handrails
4.31 Telephones
4.33 Assembly Areas
5.0 Restaurants and Cafeterias
8.0 Libraries
A4.27 Controls and Operating Mechanisms
APPENDIX J